The Project

A well was drilled at Efri Reykir in 1988. The well has served nearby farms and 400 cottages. It is envisaged that the heat plant will utilize heat from 140 ° C to produce electricity before the hot water will be delivered at 90 ° C into the district heating system. 600 kW will be produced at Efri Reykir to begin with.